58 Globester – New Insulation and Floor

January 31, 2016 / 58 Globester, Project Updates /
IMG_2150.JPG

With the chassis repaired and painted we fitted cellotex insulation between the sections before laying a new waterproof phelonic plywood floor. The insulation is taped to prevent condensation problems and wooden battens have been set in to help with fixing. After the flooring is cut to size all edges are carefully sealed before securing to the chassis.  

On the walls a roof the foil insulation has been carefully bonded to the skin with all edges sealed, again to avoid any condensation problems