46 Spartan – Insulation

October 26, 2017 / 1946 Spartan /
img_3799.jpg

As the Spartan will be lined with plywood great care has been taken to avoid any potential water damage via leaks or condensation. We have glued one layer of insulation to the outer skin with a second layer across the ribs to give an air gap. The inner insulation has been taped and sealed to form a moisture barrier. 


47 Spartan – 1st fix wiring

October 25, 2017 / 1946 Spartan /
img_3789.jpg

Between the first and second layers of insulation we have fitted all the necessary wiring and cable conduits


46 Spartan – Preparation of the inner skin

October 10, 2017 / 1946 Spartan /
img_3766.jpg

The first job is to paint each panel internal face with a protective bituminous coating prior to fitting insulation 


46 Spartan – Arrival at the Workshop

October 6, 2017 / 1946 Spartan /
img_3749.jpg

The very much anticipated arrival of a beautiful 26ft 1946 Spartan Manor – here for a complete interior.

This 71 year old trailer was originally lined in birch plywood with birch plywood cabinets. 

The new interior will use the same materials and a layout similar to the original with a front sofa (the observation lounge), middle kitchen an dinette, bathroom and rear bed.