68 Overlander – Fitting the kitchen part 1

March 30, 2015 / Overlander 2, Project Updates /
IMG_0508.JPG

The previously built main kitchen unit has been designed to fit over the wheel arch which has has been insulated in preparation. 

    


68 Overlander – Bathroom Structural Work

March 30, 2015 / Overlander 2, Project Updates /
IMG_0497.JPG

The bathroom “pod” will include a toilet, shower and the bathroom sink cabinet which has already been built with a fibreglassed wet room floor. There will be a “pocket” door which slides away into the partition. The photos show the walls being formed and the plywood floor structure. You can also see the custom build black waste tank which is located under the marine type toilet. 

   

     

Here is the floor before and after the fibreglass

   

 


68 Overlander – Vynil Flooring

March 30, 2015 / Overlander 2, Project Updates /
IMG_0505.JPG

its time to fit the vynil flooring before too much furniture is fitted. Quality hard wearing vynil is stiff and difficult to fit at the best of times. This vynil has a silver pattern over dark brown, perfect against the aluminium and Walnut. This will give a waterproof and easy to clean base, on top of which removable carpets can be fitted.

  


68 Overlander – Bathroom sink unit

March 1, 2015 / Overlander 2, Project Updates /
IMG_0491.JPG

The bathroom sink unit is the final peice of interior furniture that will be built in the workshop before the bathroom itself is built and the kitchen units fitted. The round sink on the left sits beneath a resin surface and the cupboard to the right is set back to give more room around the toilet. Not sure yet if I am going to fit a rolling tambour door or frosted glass.